Skip to main content

Causes of Delay in Various Construction Projects: A Literature Review

  • Conference paper
  • First Online:
Advances in Human Factors, Sustainable Urban Planning and Infrastructure (AHFE 2018)

Part of the book series: Advances in Intelligent Systems and Computing ((AISC,volume 788))

Included in the following conference series:

Abstract

The construction industry plays a vital role in the establishment of physical infrastructures to improve the quality of life today. However, one of the most common problems associated with the industry is the issue of delay in construction projects. Overtime, this subject has caused a multitude of negative effects on the project itself as well as the construction professionals. This paper aims to identify the various causes of construction projects delay and make recommendations to mitigate this concern. A review of relevant literatures was conducted from conference articles and journal from databases including Springer, Emerald, Taylor and Francis online, ASCE, Scopus amongst others. The distillation of literature through thematic analysis revealed that poor site management; shortage of skilled labour; unrealistic project scheduling; labour absenteeism; design changes/rework due to the construction errors and accidents due to poor site safety are some of the major causes of delay in the timely delivery of construction projects. This paper therefore recommends that in order to achieve timely delivery of projects, there is an increased need for teamwork between the client, contractors and consultants. The results of this study will be useful to construction professionals (clients, contractors and consultants), and academicians.

This is a preview of subscription content, log in via an institution to check access.

Access this chapter

Chapter
USD 29.95
Price excludes VAT (USA)
  • Available as PDF
  • Read on any device
  • Instant download
  • Own it forever
eBook
USD 169.00
Price excludes VAT (USA)
  • Available as EPUB and PDF
  • Read on any device
  • Instant download
  • Own it forever
Softcover Book
USD 219.99
Price excludes VAT (USA)
  • Compact, lightweight edition
  • Dispatched in 3 to 5 business days
  • Free shipping worldwide - see info

Tax calculation will be finalised at checkout

Purchases are for personal use only

Institutional subscriptions

Similar content being viewed by others

References

  1. Al-Kharashi, A., Skitmore, M.: Causes of delays in Saudi Arabian public sector construction projects. Constr. Manag. Econ. 27, 3–23 (2009). https://doi.org/10.1080/01446190802541457

    Article  Google Scholar 

  2. Assaf, S.A., Al-Khalil, M., Al-Hazmi, M.: Causes of delay in large building construction projects. J. Manag. Eng. 11(2), 45–50 (1995)

    Article  Google Scholar 

  3. Assaf, S.A., Al-Hejji, S.: Causes of delay in large construction projects. Int. J. Proj. Manag. 24, 349–357 (2006). https://doi.org/10.1016/j.ijproman.2005.11.010

    Article  Google Scholar 

  4. Austin, S.A., Baldwin, A.N., Steele, J.L.: Improving building design through integrated planning and control. Eng. Constr. Architectur. Manag. 9, 249–258 (2002). https://doi.org/10.1108/eb021220

    Article  Google Scholar 

  5. Bronh, S., Cawdu, C., Choeung, T.: OSH status report – Cambodia. Asia Monitor Resource Centre (2012). http://www.amrc.org.hk/sites/default/files/Cambodia_1.pdf. Accessed 12 Aug 2016

  6. Doloi, H., Sawhney, A., Iyer, K.C., Rentala, S.: Analysing factors affecting delays in Indian construction projects. Int. J. Proj. Manag. 30, 479–489 (2012). https://doi.org/10.1016/j.ijproman.2011.10.004

    Article  Google Scholar 

  7. Durdyev, S., Omarov, M., Ismail, S.: Causes of delay in residential construction projects in Cambodia. Cogent Eng. 4(1), 1291117 (2017)

    Google Scholar 

  8. Faridi, A., El-Sayegh, S.: Significant factors causing delay in the UAE construction industry. Constr. Manag. Econ. 24, 1167–1176 (2006)

    Article  Google Scholar 

  9. Farooqui, R., Farrukh, A., Rafeequi, A.: Safety performance in construction industry of Pakistan. In: Proceedings of the 1st International Conference on Construction in the Developing Countries (ICCIDC-I), Karachi, 4–5 August 2008

    Google Scholar 

  10. Frimpong, Y., Oluwoye, J., Crawford, L.: Causes of delay and cost overrun in construction of groundwater projects in a developing country. Ghana as a case study. Int. J. Proj. Manag. 21, 321–326 (2003). https://doi.org/10.1016/S0263-7863(02)00055-8

    Article  Google Scholar 

  11. Fugar, F.D.K., Agyakwah-Baah, A.B.: Delays in building construction projects in Ghana. Australas. J. Constr. Econ. Build. 10, 103–116 (2010). https://doi.org/10.5130/AJCEB.v10i1-2.1592

    Article  Google Scholar 

  12. Haseeb, M., Xinhai-Lu, Bibi, A., Maloof-ud-Dyian, Rabbani, W.: Problems of projects and effects of delays in the construction industry of Pakistan. Austr. J. Bus. Manag. Res. 1, 41–50 (2011)

    Google Scholar 

  13. Kaliba, C., Muya, M., Mumba, K.: Cost escalation and schedule delays in road construction projects in Zambia. Int. J. Proj. Manag. 27, 522–531 (2009). https://doi.org/10.1016/j.ijproman.2008.07.003

    Article  Google Scholar 

  14. Kazaz, A., Ulubeyli, S., Tuncbilekli, N.A.: Causes of delays in construction projects in Turkey. J. Civ. Eng. Manag. 18, 426–435 (2012). https://doi.org/10.3846/13923730.2012.698913

    Article  Google Scholar 

  15. Lindhard, S., Wandahl, S.: Scheduling of large, complex, and constrained construction projects – an exploration of LPS application. Int. J. Proj. Organ. Manag. 6, 237–253 (2014). https://doi.org/10.1504/IJPOM.2014.065258

    Article  Google Scholar 

  16. Mahamid, I., Bruland, A., Dmaidi, N.: Causes of delay in road construction projects. J. Manag. Eng. 28, 300–310 (2012). https://doi.org/10.1061/(ASCE)ME.1943-5479.0000096

    Article  Google Scholar 

  17. Mansfield, N.R., Ugwu, O.O., Doran, T.: Causes of delay and cost overruns in Nigerian construction projects. Int. J. Proj. Manag. 12(4), 254–260 (1994)

    Article  Google Scholar 

  18. Miterev, M., Nedelcu, R.: The nature of the relationship between project complexity and project delay: case study of ERP system implementation projects. Master thesis, Umeå School of Business and Economics (2011). http://www.projektakademien.se/pa/wp-content/uploads/2014/04/1.-Master-Thesis_2012_Miterev-and-Nedelcu.pdf. Accessed 21 Aug 2016

  19. Ogunlana, S.O., Promkuntong, K., Jearkjirm, V.: Construction delays in a fast-growing economy: comparing Thailand with other economies. Int. J. Proj. Manag. 14, 37–45 (1996). https://doi.org/10.1016/0263-7863(95)00052-6

    Article  Google Scholar 

  20. Orangi, A., Palaneeswaran, E., Wilson, J.: Exploring delays in Victoria-based Australian pipeline projects. Procedia Eng. 14, 874–881 (2011)

    Article  Google Scholar 

  21. Ren, Z., Atout, M., Jones, J.: Root causes of construction project delays in Dubai. In: Dainty, A. (ed.), Proceedings 24th Annual ARCOM Conference, pp. 749–757. Association of Researchers in Construction Management, Cardiff, 1–3 September 2008

    Google Scholar 

  22. Sambasivan, M., Soon, Y.W.: Causes and effects of delays in Malaysian construction industry. Int. J. Proj. Manag. 25, 517–526 (2007). https://doi.org/10.1016/j.ijproman.2006.11.007

    Article  Google Scholar 

  23. Santoso, D., Soeng, S.: Analysing delays of road construction projects in Cambodia: Causes and effects. J. Manag. Eng. (2016). https://doi.org/10.1061/(ASCE)ME.1943-5479.0000467

  24. Sunjka, B.P., Jacob, U.: Significant causes and effects of project delays in the Niger delta region. In: SAIIE25 Proceedings: Stellenbosch, South Africa © 2013 SAIIE, Cape Town (2013)

    Google Scholar 

  25. Zack, J.G.: Schedule delay analysis; is there agreement? In: Proceedings of PMI-CPM College of Performance Spring Conference. Project Management Institute—College of Performance Management, New Orleans, 7–9 May 2003

    Google Scholar 

Download references

Author information

Authors and Affiliations

Authors

Corresponding author

Correspondence to Mbuyamba Mbala .

Editor information

Editors and Affiliations

Rights and permissions

Reprints and permissions

Copyright information

© 2019 Springer International Publishing AG, part of Springer Nature

About this paper

Check for updates. Verify currency and authenticity via CrossMark

Cite this paper

Mbala, M., Aigbavboa, C., Aliu, J. (2019). Causes of Delay in Various Construction Projects: A Literature Review. In: Charytonowicz, J., Falcão, C. (eds) Advances in Human Factors, Sustainable Urban Planning and Infrastructure. AHFE 2018. Advances in Intelligent Systems and Computing, vol 788. Springer, Cham. https://doi.org/10.1007/978-3-319-94199-8_47

Download citation

  • DOI: https://doi.org/10.1007/978-3-319-94199-8_47

  • Published:

  • Publisher Name: Springer, Cham

  • Print ISBN: 978-3-319-94198-1

  • Online ISBN: 978-3-319-94199-8

  • eBook Packages: EngineeringEngineering (R0)

Publish with us

Policies and ethics