Abstract
Poka-yoke systems (from the Japanese “mistake-proofing”) are defined within the construction sector as a group within specific tools available to implement the principles of Lean Construction. These principles are a way of designing construction projects in such a way that waste of materials, time and effort are minimized in order to generate the maximum possible value for the final customer. Objective: The aim of current research is to perform an analysis of the state of the art about publications dealing with Lean construction, poka-yokes, and preventive measures in the construction sector. Methodology: Main scholar databases were accessed by entering keywords related to the scope of the research. Results: In general, the impact of Lean technologies in the construction sector, including poka-yokes methodologies, has been investigated in some previous research. The main challenges that present the implementation of this type of techniques in a sector such as construction have been identified: the change in the work culture of the organizations, the lack of knowledge about the Lean techniques, or the costs and complexity of the implementation of the techniques. Some authors consider the Lean tools effective in increasing the safety conditions of workers and reduce the accident rate in construction sites, but other authors do not believe that there is empirical evidence to justify a significant improvement in the conditions of work. Conclusions: In order to increase the effectiveness of the poka-yoke in the form of Personal Protective Equipment (PPE), it is necessary to know more about the human failures present in incidents and accidents. Similarly, the design and implementation of poka-yokes in construction activities is difficult because many activities are based on the taking of previous decisions, which generate a dynamic planning in which the conditions of risks and defects are in continuous change. Additionally, some examples of poka-yoke device in construction sector were proposed by the authors at the end of the results section.
Access this chapter
Tax calculation will be finalised at checkout
Purchases are for personal use only
Similar content being viewed by others
References
Abdelhamid, T., Salem, S.: Lean construction: a new paradigm for managing construction projects. In: Proceedings of the International Workshop on Innovations in Materials and Design of Civil Infrastructure, pp. 28–29 (2005)
Salem, O., Zimmer, E.: Application of Lean manufacturing principles to construction. Lean Constr. J. 2(2), 51–54 (2005)
Shingo, S.: Zero Quality Control: Source Inspection and the Poka-Yoke System. CRC Press, Boca Raton (1986)
Bashir, A.M., Suresh, S., Proverbs, D., Gameson, R.: A critical, theoretical, review of the impacts of Lean construction tools in reducing accidents on construction sites. In: Proceedings of 27th Annual ARCOM Conference, Bristol, UK, pp. 5–7. Association of Researchers in Construction Management (2011)
Mossman, A.: Why isn’t the UK construction industry going lean with gusto? Lean Constr. J. (2009)
Bashir, A.M., Suresh, S., Oloke, D.A., Proverbs, D.G., Gameson, R.: Overcoming the challenges facing Lean construction practice in the UK contracting organizations. Int. J. Archit. Eng. Constr. 4(1), 10–18 (2015)
Saurin, T.A., Formoso, C.T., Cambraia, F.B.: Towards a common language between Lean production and safety management. In: Proceedings IGLC-14 (2006)
Thomassen, M.A., Sander D., Barnes K.A., Nielsen, A.: Experience and results from implementing Lean construction in a large Danish contracting firm. In: Proceedings of the 11th Annual Conference on Lean Construction, 22–24 July, Blacksburg, VA, USA, pp. 644–655 (2003)
Mitropoulos, P., Cupido, G., Namboodiri, M.: Safety as an emergent property of the production system: how Lean practices reduce the likelihood of accidents. In: Proceedings of the 15th International Group for Lean Construction Annual Conference, Michigan, USA (2007)
Hollnagel, E.: Barriers and Accident Prevention. Ashgate, Aldershot (2004)
Saurin, T.A., Ribeiro, J.L.D., Vidor, G.: A framework for assessing poka-yoke devices. J. Manuf. Syst. 31(3), 358–366 (2012)
Shah, R., Ward, P.T.: Lean manufacturing: context, practice bundles, and performance. J. Oper. Manag. 21(2), 129–149 (2003)
Matson, J.E., Matson, J.O.: Just-in-time implementation issues among automotive suppliers in the Southern USA. Supply Chain Manag. Int. J. 12(6), 432–443 (2007)
Acknowledgements
We wish to thank the Spanish Ministry of Economy and Competitiveness for financing project BIA2016-79270-P. It is also important to acknowledge the Ministry of Education, Culture and Sports of the Government of Spain for it support through the predoctoral contracts (FPU 2016/03298)
Author information
Authors and Affiliations
Corresponding author
Editor information
Editors and Affiliations
Rights and permissions
Copyright information
© 2019 Springer International Publishing AG, part of Springer Nature
About this paper
Cite this paper
Rubio-Romero, J.C., del Carmen Pardo Ferreira, M., López-Arquillos, A. (2019). Poka-Yokes as Occupational Preventive Measures in Construction Safety. A Review. In: Arezes, P. (eds) Advances in Safety Management and Human Factors. AHFE 2018. Advances in Intelligent Systems and Computing, vol 791. Springer, Cham. https://doi.org/10.1007/978-3-319-94589-7_54
Download citation
DOI: https://doi.org/10.1007/978-3-319-94589-7_54
Published:
Publisher Name: Springer, Cham
Print ISBN: 978-3-319-94588-0
Online ISBN: 978-3-319-94589-7
eBook Packages: EngineeringEngineering (R0)